http://www.jordan11retrosales.com .The next stage of the mine design aimed to open-cut mine the Shengli No. 1 pipe with the Wangzhuang main diamond deposit and was finished in 1976. The designed capability is as follows: the ore mining ability is ninety six,200 plenty of ore each year, the ore dressing ability is ninety,000 a lot of ore a year, as well as the annual production is mostly forty,000 to fifty,000 carats of diamonds.
|